{"bundle_id":1428,"completed_at":"2 Sep 2026, 19:25 GMT","download_name":"direct_stream_according-to-the-mekong-river-commission-preparatory-works-are-under-way-with-th_12172.zip","download_url":"/direct/item/12172/download/file/1428","error":"","item_id":12172,"ready":true,"status":"completed","status_url":"/direct/item/12172/download/status/1428","title":"According to the Mekong River Commission, preparatory works are under way, with the main construction scheduled to begin in October 2026, following the wet season."}
